Compact backyard studio with tall glass doors
AI illustration

Models

Five ways to start an ADU in Venice

Two garage conversions and three backyard units. Pick the closest one, then configure it to your own measurements.

Garage conversion

Open Studio Garage ADU

An efficient open living and sleeping configuration with a full kitchen and bathroom inside an existing garage envelope.

Size
350–450 sq ft
Planning range
$85K–$135K
Build time
8–12 weeks
  • Open living and sleeping space
  • Full kitchen and bathroom
  • Good fit for rentals, guests, or home office use
  • Converts an existing garage into livable space

Garage conversion

Compact 1-Bedroom Garage ADU

A private bedroom, comfortable living zone, full kitchen, and bathroom arranged within a larger garage conversion.

Size
450–550 sq ft
Planning range
$115K–$175K
Build time
10–14 weeks
  • Private bedroom
  • Full kitchen and bathroom
  • Separate living area
  • Good fit for longer-term rental or family use
Detached Studio ADU: example interior or exteriorAI illustration

Detached ADU

Detached Studio ADU

A private detached living space with an open studio layout, full kitchen, and bathroom in a compact footprint.

Size
350–500 sq ft
Planning range
$120K–$190K
Build time
12–16 weeks
  • Private detached living space
  • Full kitchen and bathroom
  • Flexible living and sleeping layout
  • Compact backyard footprint
Detached 1-Bedroom ADU: example interior or exteriorAI illustration

Detached ADU

Detached 1-Bedroom ADU

A comfortable detached one-bedroom home with a full kitchen, bathroom, and separate living area.

Size
550–700 sq ft
Planning range
$150K–$230K
Build time
14–18 weeks
  • Separate bedroom
  • Full kitchen and bathroom
  • Spacious living area
  • Good fit for rental or multigenerational use
Detached 2-Bedroom ADU: example interior or exteriorAI illustration

Detached ADU

Detached 2-Bedroom ADU

A larger detached ADU with two private bedrooms, open living and dining, a full kitchen, and bathroom.

Size
750–1000 sq ft
Planning range
$190K–$300K+
Build time
16–22 weeks
  • Two private bedrooms
  • Full kitchen and bathroom
  • Open living and dining area
  • Good fit for family, long-term rental, or extended living

Sizes, planning ranges and build times come from the MyADUPlan catalog. They are typical ranges for planning, not quotes: site conditions, finishes, utilities and permit requirements change the final cost. Photos are illustrations.

Plan first, then permit

See what fits your Venice garage or backyard.

Measure the space, pick a layout and get a preliminary floor plan, concept photo and one-sheet in a few minutes. Free, no obligation.

Garage conversions, JADUs and backyard ADUs. Start with the space you have; refine it any time.

Start My Free ADU Plan